Heavy ion accelerator

Manufacturing of a clean room for vertical test preparation within the heavy ion accelerator facility of the Institute for Basic Science

  • ·Institute for Basic Science heavy ion accelerator project group accelerator SRF VT Cleanroom & Control Booth
  • ·Use: preparation and control of SRF Vertical Test
  • ·Structure type: H-shaped steel ramen structure
  • ·Total floor area: 158.4 m2
  • ·Cleanroom cleanliness: 10,000Class (56.7m2)

Telescopic Power Manipulater

A remote control device used to perform various tasks perfectly in radioactively contaminated areas that are inaccessible to human workers

Heavy ion accelerator business status

  • ·Plan to build a world-class heavy ion accelerator as a core basic research facility in the science belt
  • ·Sponsored by Ministry of Science, ICT and Future Planning/IBS (2011-2021)
  • ·Location: Sindong area, Yuseong-gu, Daejeon
  • ·Total project cost: KRW 1,428.9 billion (KRW 460.2 billion for equipment construction and KRW 969.6 billion for facilities)
  • ·Specifications: 200MeV/u (based on uranium) beam energy and 400kW beam output

Heavy ion accelerator principle

Overview of the heavy ion accelerator

Target module, which is a core device for generating ISOL RI beams, and hot cell prototype for remote maintenance

  1. Establishing the maintenance procedure for on-site TIS remote operation and designing main product  / Conducting a performance test to verify operation characteristics
  2. Facility composition
    • Target/ion source (TIS) and front-end system
    • TIS module vacuum system / Utility Mitch Beamline
    • Hot cell structure and TIS module driving system
    • Manipulator and remote control auxiliary device
    • Interlock / control / monitoring system
    • Victex Co., Ltd. signed a contract with the Institute for Basic Science to manufacture and install prototypes (2016.09 ~ 2017.06)
  • 1Hot Cells
  • 2Target & Ion Source Storage Locker
  • 3Irradiated-target Storage
  • 4Pre-separator Room
  • 5Target Station

Hot cell - Mock up